Clean-up
Wet product: Soap and water as soon as possible.
Dry product: Scraper and mineral spirits.
Storage
Between 5°C (40°F) and 35°C (95°F) in a dry area. Keep container hermetically closed when not in use.
Surface Preparation
Materials, adhesive and room must be maintained at a temperature between 15°C (60°F) and 30°C (85°F) for at least 24 hours before installation and for a few days afterward. Surfaces should be smooth, clean, dry and free from oil, grease, wax or all contaminants. Floors must be insulated from the ground with a vapour barrier membrane, be structurally sound and even. Grout holes and joints.
Product Application
Apply adhesive with the recommended trowel. Set covering in place and roll with a 68 kg (150 lb.) 3-section roller. Note: Always use a trowel so that 80% of the back of the material is covered with adhesive once it is in place.
Working Time
40 minutes. Very warm temperatures or an improper trowel will affect working time. If a skin forms on the adhesive, scrape the adhesive and reapply. Wait 24 hours before walking on the floor.