Clean-up
Mineral spirits
Storage
Between 5°C (40°F) and 35°C (95°F)
Surface Preparation
Surfaces must be clean, dry and structurally sound. Cut nozzle for a bead of 6 mm (1/4 in.). Puncture inner seal.
Product Application
Panelling to studs: Apply a bead to each strip or stud. Position materials so edges meet at stud centre. Use screws or nails as needed. On flat surfaces: Apply zigzag vertical beads, a maximum of 30 cm (12 in.) apart and within 3.8 cm (1.5 in.) of all edges.
Working Time
15 minutes. Fully set within 7 days.