Clean-up
Wet product: Soap and water.
Dry product: Scraper and mineral spirits.
Storage
Between 5°C (40°F) and 35°C (95°F) in a dry area. Keep container hermetically closed when not in use.
Surface Preparation
Materials, adhesive and room must be maintained at a temperature between 15°C (60°F) and 30°C (85°F) for at least 24 hours before installation and for a few days afterward. Surfaces should be smooth, clean, dry and free from oil, grease, wax, paint, varnish or all contaminants.
Product Application
Spread adhesive evenly over the surface using the recommended trowel. Allow 15 minutes for adhesive to set and bond within 45 minutes. Wall: Install the tiles from top to bottom. Firmly press the panel to the adhesive while sliding it slightly. Floor: Set tile and tamp immediately with a padded block. Note: Always use a trowel so that 80% of the back of the material is covered with adhesive once it is in place.
Working Time
45 minutes. Very warm temperatures or an improper trowel will affect working time. Wait 24 hours before grouting or walking on the floor. Wait longer if tile is set on dense or cold floors. Fully cures within 10 days.